Skip to content
BirlesaBirlesa
Ask or searchSign in
Menu

EstoniaOpen tenderKind of contract: Works

Estonia – Secondary school construction work – Near-zero energy building wing construction works for Keila Kool Pargimaja

Original: Estonia – Secondary school construction work – Keila Kooli Pargimaja liginullenergia korpuse ehitustöödMachine translation
Buyer
Aktsiaselts Keila Vesi · Estonia
Posted
16 October 2026
Deadline
2 December 2026
Reference number
715405-2026
CPV codes
45214220
Place of delivery
EE001 (Estonia)
Seen at TED 20 hours ago

In short

  • Wanted: Construction.
  • Estimated value: €7,015,000, as the notice states it.
  • Buyer: Aktsiaselts Keila Vesi, Estonia.
  • Offers by 2 December 2026, 29 days left.

Can a company from Türkiye take part?

The buyer decides on Turkish bids

  • Türkiye has no procurement agreement with this market: a Turkish firm has no right of access, but the buyer may accept its bid.
  • Works on site: they usually need a presence there.

Rests on: Directive 2014/24/EU, Art. 25; Court of Justice, C-652/22 Kolin (22 October 2024)

Guidance from the official rules, not legal advice: the tender documents decide.

Next step

You have time: download the notice and its documents, and send your questions to the buyer well before the deadline.

If taking part directly is unclear, go in with a partner or distributor in that country.

Documents to prepare

The full list of what to submit is in the tender documents at the source.

Items

Items
ItemQuantityCodes
Estonia – Secondary school construction work – Keila Kooli Pargimaja liginullenergia korpuse ehitustööd Keila Kooli Pargimaja liginullenergia korpuse ehitamine. Ehitustöid kaasrahastab Riigi Tugiteenuste Keskuse (RTK), projekti nr. Kliima , vastavalt määrusele nr 49, 08.12.2020 „Kohaliku omavalitsuse üksustele liginullenergiahoonete ehitamiseks antava toetuse kasutamise tingimused ja kord“. Ehitustööde käigus tuleb lammutada Keila linnas aadressil Pargi 2e asuva koolimaja keskne korpus ning ehitada asemele kompaktne liginullenergiahoone suletud netopinnaga 3772,7 m². Ehitus kavandatakse ühes ehitusetapis, mis hõlmab olemasolevate hooneplokkide lammutamist, uue hooneosa ja välisruumi ehitust ja sidumist Pargi tn 2e/1 hoone ploki ning Pargi 2 paikneva ajaloolise hoonega. / Kõrvaldamise alused ja kvalifitseerimistingimused: Vaata hanke alusdokumentidest—cpv:45214220, nace:41, nace:42, nace:43

↵ select↑↓ moveesc close