DanimarkaAçık ihaleSözleşme türü: Mal alımı
Danimarka – Boru hattı, borulama, borular, muhafaza borusu, tüp ve ilgili kalemler – Danimarka Hidrojen Omurgası ile ilgili Vana Tedarik Sözleşmeleri için tedarikçi yeterlilik sistemi - 26/23313
Orijinali (İngilizce): Denmark – Pipeline, piping, pipes, casing, tubing and related items – Supplier qualification system for Valve Supply Contracts concerning the Danish Hydrogen Backbone - 26/23313Makine çevirisi- Alıcı
- Energinet Brint A/S · Danimarka
- Yayımlanma
- 27 Ekim 2026
- Son tarih
- 18 Kasım 2026
- İhale kayıt no
- 743116-2026
- CPV kodları
- 44160000
- Teslim yeri
- Danimarka
Kısaca
- Aranan: Mobilya ve ahşap, Seramik, cam ve taş.
- Alıcı: Energinet Brint A/S, Danimarka.
- Son başvuru: 18 Kasım 2026, 15 gün kaldı.
Türkiye'den bir firma katılabilir mi?
Türk teklifine alıcı karar verir
- Türkiye'nin bu pazarla bir kamu alımı anlaşması yok: Türk firmasının katılım hakkı yoktur, ama alıcı teklifini kabul edebilir.
- Bir kamu hizmeti kuruluşunun mal alımı: mallarının yarısından fazlası AB dışından gelen bir teklif reddedilebilir.
Dayanağı: Directive 2014/24/EU, Art. 25; Court of Justice, C-652/22 Kolin (22 October 2024); Directive 2014/25/EU, Art. 85
Resmî kurallardan bir yol gösterme, hukuki görüş değildir: belirleyici olan ihale belgeleridir.
Sonraki adım
Vaktiniz var: ilanı ve belgelerini indirin, sorularınızı son günden önce alıcıya iletin.
Doğrudan katılım belirsizse o ülkede çalışan bir ortak ya da distribütörle girin.
Hazırlanacak belgeler
Verilecek belgelerin tam listesi kaynaktaki ihale belgelerindedir.
Pazar bağlamı
5 Türk firması bu fırsata uygun.
Kalemler
| Kalem | Miktar | Kodlar |
|---|---|---|
| Denmark – Pipeline, piping, pipes, casing, tubing and related items – Supplier qualification system for Valve Supply Contracts concerning the Danish Hydrogen Backbone - 26/23313 Changed: corrected by the buyer. The Danish Hydrogen Backbone (DHB) project is a comprehensive effort to establish a hydrogen infra-structure in Denmark, connecting planned large-scale hydrogen production in Denmark, produced from renewable energy sources such as wind and solar, with the German and European hydrogen markets. The project is part of the European hydrogen infrastructure and significantly contributes to the EU's goals of climate neutrality and reduction of greenhouse gas emissions. The full backbone is planned to extend all the way from underground storage in the northern part of Denmark (Lille Torup) to the German border (Frøslev), but a political decision has been made to initially focus on building the southern part of the system (Danish Hydrogen Pipeline – Phase 1), and thereby having this part operational by the end of 2030. The purpose of the SQS is to establish a pool of qualified Suppliers that may be invited to participate in procurements for the supply of valves required for the DHB. The SQS covers two valve qualification categories: Mainline & Large Station Ball Valves, including mainline, pipeline, large station, manual piping and process ball valves in manual and actuated configurations; and Control Valves, including General Control Valves and Critical / Severe-Service Control Valves.. Applicants may apply for one or both categories. Final quantities, sizes, pressure classes, duties and technical requirements will be specified in the individual tender documents. V1 Mainline & Large Station Ball Valves: Mainline isolation ball valves, pipeline ball valves, large station ball valves, manual piping and process ball valves, bypass ball valves and other critical ball valves, including manual, motor-operated, electro-hydraulic, shutdown, emergency shutdown, blowdown and slam-shut configurations. V2 Control Valves: General process and utility control valves, including flow-control and pressure-control valves, and critical or severe-service control | — | cpv:44160000, nace:23, nace:23.6, nace:23.3, nace:16, nace:16.2 |