DenmarkOpen tenderKind of contract: Goods
Denmark – Pipeline, piping, pipes, casing, tubing and related items – Supplier qualification system for Valve Supply Contracts concerning the Danish Hydrogen Backbone - 26/23313
- Buyer
- Energinet Brint A/S · Denmark
- Posted
- 27 October 2026
- Deadline
- 18 November 2026
- Reference number
- 743116-2026
- CPV codes
- 44160000
- Place of delivery
- Denmark
In short
- Wanted: Furniture & wood, Ceramics, glass & stone.
- Buyer: Energinet Brint A/S, Denmark.
- Offers by 18 November 2026, 15 days left.
Can a company from Türkiye take part?
The buyer decides on Turkish bids
- Türkiye has no procurement agreement with this market: a Turkish firm has no right of access, but the buyer may accept its bid.
- A utility's supply contract: a bid whose goods are more than half from outside the EU may be rejected.
Rests on: Directive 2014/24/EU, Art. 25; Court of Justice, C-652/22 Kolin (22 October 2024); Directive 2014/25/EU, Art. 85
Guidance from the official rules, not legal advice: the tender documents decide.
Next step
You have time: download the notice and its documents, and send your questions to the buyer well before the deadline.
If taking part directly is unclear, go in with a partner or distributor in that country.
Documents to prepare
The full list of what to submit is in the tender documents at the source.
Market context
5 companies in Türkiye fit this opportunity.
Items
| Item | Quantity | Codes |
|---|---|---|
| Denmark – Pipeline, piping, pipes, casing, tubing and related items – Supplier qualification system for Valve Supply Contracts concerning the Danish Hydrogen Backbone - 26/23313 Changed: corrected by the buyer. The Danish Hydrogen Backbone (DHB) project is a comprehensive effort to establish a hydrogen infra-structure in Denmark, connecting planned large-scale hydrogen production in Denmark, produced from renewable energy sources such as wind and solar, with the German and European hydrogen markets. The project is part of the European hydrogen infrastructure and significantly contributes to the EU's goals of climate neutrality and reduction of greenhouse gas emissions. The full backbone is planned to extend all the way from underground storage in the northern part of Denmark (Lille Torup) to the German border (Frøslev), but a political decision has been made to initially focus on building the southern part of the system (Danish Hydrogen Pipeline – Phase 1), and thereby having this part operational by the end of 2030. The purpose of the SQS is to establish a pool of qualified Suppliers that may be invited to participate in procurements for the supply of valves required for the DHB. The SQS covers two valve qualification categories: Mainline & Large Station Ball Valves, including mainline, pipeline, large station, manual piping and process ball valves in manual and actuated configurations; and Control Valves, including General Control Valves and Critical / Severe-Service Control Valves.. Applicants may apply for one or both categories. Final quantities, sizes, pressure classes, duties and technical requirements will be specified in the individual tender documents. V1 Mainline & Large Station Ball Valves: Mainline isolation ball valves, pipeline ball valves, large station ball valves, manual piping and process ball valves, bypass ball valves and other critical ball valves, including manual, motor-operated, electro-hydraulic, shutdown, emergency shutdown, blowdown and slam-shut configurations. V2 Control Valves: General process and utility control valves, including flow-control and pressure-control valves, and critical or severe-service control | — | cpv:44160000, nace:23, nace:23.6, nace:23.3, nace:16, nace:16.2 |