DanimarkaAçık ihaleSözleşme türü: Mal alımı
Danimarka – Boru hatları, borular, kasa, tüp ve ilgili ürünler – Danimarka Hidrojen Omurgası için SAWL Linepipe ve Boru Hattı İndüksiyonlu Dirsek Tedarik Sözleşmeleri için Tedarikçi Yeterlilik Sistemi - 26/24083
Orijinali (İngilizce): Denmark – Pipeline, piping, pipes, casing, tubing and related items – Supplier Qualification System for SAWL Linepipe and Pipeline Induction Bend Supply Contracts for the Danish Hydrogen Backbone - 26/24083Makine çevirisi- Alıcı
- Energinet Brint A/S · Danimarka
- Yayımlanma
- 30 Ekim 2026
- Son tarih
- 27 Kasım 2026
- İhale kayıt no
- 753088-2026
- CPV kodları
- 44160000, 44161100, 44163200
- Teslim yeri
- Danimarka
Kısaca
- Aranan: Mobilya ve ahşap, Seramik, cam ve taş.
- Alıcı: Energinet Brint A/S, Danimarka.
- Son başvuru: 27 Kasım 2026, 24 gün kaldı.
Türkiye'den bir firma katılabilir mi?
Türk teklifine alıcı karar verir
- Türkiye'nin bu pazarla bir kamu alımı anlaşması yok: Türk firmasının katılım hakkı yoktur, ama alıcı teklifini kabul edebilir.
- Bir kamu hizmeti kuruluşunun mal alımı: mallarının yarısından fazlası AB dışından gelen bir teklif reddedilebilir.
Dayanağı: Directive 2014/24/EU, Art. 25; Court of Justice, C-652/22 Kolin (22 October 2024); Directive 2014/25/EU, Art. 85
Resmî kurallardan bir yol gösterme, hukuki görüş değildir: belirleyici olan ihale belgeleridir.
Sonraki adım
Vaktiniz var: ilanı ve belgelerini indirin, sorularınızı son günden önce alıcıya iletin.
Doğrudan katılım belirsizse o ülkede çalışan bir ortak ya da distribütörle girin.
Hazırlanacak belgeler
Verilecek belgelerin tam listesi kaynaktaki ihale belgelerindedir.
Pazar bağlamı
5 Türk firması bu fırsata uygun.
Kalemler
| Kalem | Miktar | Kodlar |
|---|---|---|
| Denmark – Pipeline, piping, pipes, casing, tubing and related items – Supplier Qualification System for SAWL Linepipe and Pipeline Induction Bend Supply Contracts for the Danish Hydrogen Backbone - 26/24083 The Danish Hydrogen Backbone (“DHB”) project is a comprehensive effort to establish hydrogen infrastructure in Denmark, connecting planned large-scale renewable hydrogen production in Denmark with the German and European hydrogen markets. The full back-bone is planned to extend from underground storage in northern Denmark to the German border. The first phase focuses on the southern part of the system, with operation planned by the end of 2030. The purpose of the SQS is to establish a pool of qualified Suppliers that may be invited to participate in procurements for SAWL linepipe, external coating and pipeline induction bends required for the Danish Hydrogen Backbone. The first expected call-off is anticipated to concern the Danish Hydrogen Backbone Phase 1. The pres-ently anticipated scope includes 30-inch and 36-inch longitudinal submerged arc welded carbon steel linepipe for high-pressure hydrogen transmission service, with a design pressure up to approximately 98.9 barg. The anticipated linepipe material is API 5L Grade X60 PSL 2 or equivalent. The supply is expected to include manufacture, material traceability, inspection, testing, certification, external 3LPE coating where required, preservation, marking, packing and delivery. The anticipated scope also includes factory-manufactured 30-inch and 36-inch pipeline induction bends compatible with the associated linepipe system. The bends are presently anticipated to comply with ASME B16.49, with radii generally between approximately 5D and 10D and angles between ap-proximately 6 degrees and 90 degrees. The bend supply is expected to include mother or source pipe arrangements, tangent lengths, manufacture, heat treatment where required, inspection, testing, certification, preservation, marking, packing and delivery. Applicants may rely on the technical and professional capacity of another entity, including a specialist induction bend manufacturer, subject to the requirements stated in the SQS documents. The final | — | cpv:44160000, nace:23, nace:23.6, nace:23.3, nace:16, nace:16.2, cpv:44161100, cpv:44163200 |