DenmarkOpen tenderKind of contract: Goods
Denmark – Pipeline, piping, pipes, casing, tubing and related items – Supplier Qualification System for SAWL Linepipe and Pipeline Induction Bend Supply Contracts for the Danish Hydrogen Backbone - 26/24083
- Buyer
- Energinet Brint A/S · Denmark
- Posted
- 30 October 2026
- Deadline
- 27 November 2026
- Reference number
- 753088-2026
- CPV codes
- 44160000, 44161100, 44163200
- Place of delivery
- Denmark
In short
- Wanted: Furniture & wood, Ceramics, glass & stone.
- Buyer: Energinet Brint A/S, Denmark.
- Offers by 27 November 2026, 24 days left.
Can a company from Türkiye take part?
The buyer decides on Turkish bids
- Türkiye has no procurement agreement with this market: a Turkish firm has no right of access, but the buyer may accept its bid.
- A utility's supply contract: a bid whose goods are more than half from outside the EU may be rejected.
Rests on: Directive 2014/24/EU, Art. 25; Court of Justice, C-652/22 Kolin (22 October 2024); Directive 2014/25/EU, Art. 85
Guidance from the official rules, not legal advice: the tender documents decide.
Next step
You have time: download the notice and its documents, and send your questions to the buyer well before the deadline.
If taking part directly is unclear, go in with a partner or distributor in that country.
Documents to prepare
The full list of what to submit is in the tender documents at the source.
Market context
5 companies in Türkiye fit this opportunity.
Items
| Item | Quantity | Codes |
|---|---|---|
| Denmark – Pipeline, piping, pipes, casing, tubing and related items – Supplier Qualification System for SAWL Linepipe and Pipeline Induction Bend Supply Contracts for the Danish Hydrogen Backbone - 26/24083 The Danish Hydrogen Backbone (“DHB”) project is a comprehensive effort to establish hydrogen infrastructure in Denmark, connecting planned large-scale renewable hydrogen production in Denmark with the German and European hydrogen markets. The full back-bone is planned to extend from underground storage in northern Denmark to the German border. The first phase focuses on the southern part of the system, with operation planned by the end of 2030. The purpose of the SQS is to establish a pool of qualified Suppliers that may be invited to participate in procurements for SAWL linepipe, external coating and pipeline induction bends required for the Danish Hydrogen Backbone. The first expected call-off is anticipated to concern the Danish Hydrogen Backbone Phase 1. The pres-ently anticipated scope includes 30-inch and 36-inch longitudinal submerged arc welded carbon steel linepipe for high-pressure hydrogen transmission service, with a design pressure up to approximately 98.9 barg. The anticipated linepipe material is API 5L Grade X60 PSL 2 or equivalent. The supply is expected to include manufacture, material traceability, inspection, testing, certification, external 3LPE coating where required, preservation, marking, packing and delivery. The anticipated scope also includes factory-manufactured 30-inch and 36-inch pipeline induction bends compatible with the associated linepipe system. The bends are presently anticipated to comply with ASME B16.49, with radii generally between approximately 5D and 10D and angles between ap-proximately 6 degrees and 90 degrees. The bend supply is expected to include mother or source pipe arrangements, tangent lengths, manufacture, heat treatment where required, inspection, testing, certification, preservation, marking, packing and delivery. Applicants may rely on the technical and professional capacity of another entity, including a specialist induction bend manufacturer, subject to the requirements stated in the SQS documents. The final | — | cpv:44160000, nace:23, nace:23.6, nace:23.3, nace:16, nace:16.2, cpv:44161100, cpv:44163200 |